Design-build remodeling, Anytown
Rooms, rethought.
Kitchens, bathrooms, basements, and open main floors, designed and built by one team. A fixed price before we start, and a timeline we keep.

- Years designing and building
- 22
- Projects finished
- 410
- Finished within the fixed price
- 96%
- sample reviews
- 4.9
Figures are samples for this demo.
Case study
A kitchen for a family of five.
Three kids, two cooks, and a kitchen built for one. The owners wanted to cook and still see homework at the dining table, and they wanted everything off the counters.
- Budget
- $92,000
- Design
- 9 weeks
- Build
- 11 weeks


Selected work
Every project has a story.

A primary bath with a curbless shower
A tub nobody used became a curbless glass shower, with a long double vanity and heated floors.
- Budget
- $41,000
- Build
- 6 weeks

An open main floor in a split-level
Three small rooms opened into one, with built-ins, a fireplace wall, and a new stair rail.
- Budget
- $118,000
- Build
- 13 weeks
Budget planner
The number everyone wonders about.
Pick the project, the size, and the finish level, and see a realistic range and how many weeks of design and building to expect. Before anyone comes to your house.
Plan a budgetDesign-build
One team, six phases.
The people who design your room are the people who build it, so the drawing, the price, and the finished room all match.
- 01
Conversation
Week 0
A first visit to your home. We listen, measure roughly, talk honestly about budget, and tell you whether we are the right firm. No charge.
- 02
Design
4 to 12 weeks
Measured drawings of what is there, then two or three layouts, then the one you choose drawn in detail. An engineer joins if walls move.
- 03
Selections
2 to 4 weeks
Cabinets, counters, tile, fixtures, and lighting, chosen with you in our studio and at suppliers, all priced as you go.
- 04
Fixed price and permits
2 to 6 weeks
A fixed price for the whole build, line by line. You sign, we file permits and order long-lead items so they arrive before we need them.
- 05
Build
3 to 30 weeks
One project manager, our own carpenters, and trusted trades. Dust walls up, floors protected, a one-page update with photos every Friday.
- 06
Walkthrough and care
Last week, and a year on
A walkthrough with a list, finished within two weeks. A two-year workmanship warranty, and a visit at eleven months to fix anything that moved (sample).
Clients
In their words.
4.9 average from 164 sample reviews
- Sample review
The budget planner said $81,000 to $110,000 for our kitchen. The fixed price came in at $92,000 and the final invoice matched it. That never happens.
Kitchen - Sample review
The Friday updates were the best part. Photos, what happened, what was next, and the one decision they needed from us. We were never wondering.
Great room - Sample review
They found rot under our old tub, showed us, and priced the repair before doing anything. It was in the allowance, so the total did not change.
Primary bath - Sample review
Lovely work and great people. The steel beam came a week late and the job ran over by that week. They told us the day they knew.
Main floor Owner reply: Thank you. We now order structural steel the day the drawings are signed.
What does a remodel cost here?
Most of our kitchens land between $55,000 and $120,000, primary baths between $30,000 and $60,000, and open main floors from $80,000 (samples). The budget planner gives a range for your project in a minute; the real number comes from design.
Do you charge for design?
The first conversation is free. Design is a separate agreement, usually 4 to 8 percent of the expected build, and it is credited to the build if you go ahead with us (sample). You own the drawings either way.
Is the price fixed?
Yes. After design and selections we give you a fixed price, line by line, before any building starts. It only changes if you change the job, and every change is priced and signed before we do it.
Can we live at home during the work?
Almost always. We seal the work area with dust walls, run air scrubbers, and set up a temporary kitchen for kitchen projects. Whole-floor projects sometimes mean a few nights away; we tell you which ones in advance.
How long does a remodel take?
A kitchen is usually 6 to 10 weeks of design and 8 to 12 of building; a bathroom about half that. Permits and long-lead items like custom cabinets add time between design and building, and we plan around them.
Next step
Start with a conversation.
An hour at your home to listen, look, and talk honestly about budget and timing. No charge, and no pressure to go further.