Demo site by Digital Den
Switch industry demo
Get this site

Now scheduling design for spring 2027 builds. Kitchens designed this winter can be cooking by May. See how it works

A white kitchen with shaker cabinets, under-cabinet lighting, a farmhouse sink, and a window over it

01

Kitchens

From a better layout in the same footprint to walls out and a new island. We design around how you cook, where the light comes from, and what you need to hide.

Typical budget
$45,000 to $140,000
Typical time
8 to 12 weeks of building
  • Layout and lighting design
  • Cabinets, counters, and tile installed
  • Electrical and plumbing to code
  • Appliance coordination

Keeping the sink and range where they are saves more money than any finish choice.

Plan a kitchen budget
A white bathroom with a freestanding tub, a wall-mounted faucet, a long counter, and a plant

02

Bathrooms

Primary baths, family baths, and powder rooms. Curbless showers, heated floors, and storage that makes sense, built to stay watertight for decades.

Typical budget
$18,000 to $65,000
Typical time
3 to 7 weeks of building
  • Waterproofing behind every wet wall
  • Tile, glass, and fixtures installed
  • Ventilation sized properly
  • Blocking for grab bars, now or later

A curbless shower costs a little more in floor work and pays you back every day for twenty years.

Plan a bathroom budget
A lower-level guest bath with a wood vanity, a round mirror, and stone tile

03

Basements

Family rooms, guest suites, gyms, and offices. We start with water: drainage, a vapor barrier, and the right insulation, so it stays dry and warm.

Typical budget
$45,000 to $120,000
Typical time
10 to 14 weeks of building
  • Moisture checks before design
  • Egress windows where bedrooms need them
  • A bathroom or wet bar if you want one
  • Sound insulation in the ceiling

If the basement has ever been wet, we fix that first. Finishing over a damp wall is money lost.

Plan a basement budget
An open dining and living room with a grey sectional, a linear fireplace, and a stair with a glass rail

04

Main floors and additions

Walls out, rooms joined, or new space added. We bring in the engineer early, so the beam is in the drawing and the price before you sign.

Typical budget
$70,000 to $350,000
Typical time
10 to 30 weeks of building
  • Structural engineering and permits
  • Flooring through the whole level
  • Lighting plans room by room
  • Exterior work for additions

An addition usually costs about twice as much per square foot as remodeling space you already have.

Plan a main floor or addition budget

Next step

Start with a conversation.

An hour at your home to listen, look, and talk honestly about budget and timing. No charge, and no pressure to go further.

Website demo by Digital Den

About this demo

Demo Hearth Remodeling is a fictional design-build firm made by Digital Den to show what a remodeler website can do: tell each project as a case study with the budget and the weeks, slide from the design drawing to the finished room, answer "what will it cost?" before the first meeting, and explain the process phase by phase. Every name, figure, review, and project here is a sample.

  • Case studies with the brief, the budget, the weeks, and a drawing-to-built slider
  • A budget planner with realistic ranges and design and build timelines
  • The design-build process as a clear, phase-by-phase timeline

Get a site like this

  • Launch$2,500 to $3,500+ $149/mo
  • Growth$4,500 to $6,500+ $199/mo
  • Custom$7,500 to $10,000+ $249/mo

Live in about 2 weeks · 50% deposit to start · You own your domain · No calls needed: text or email