Bathroom · Riverbend (sample)
A primary bath with a curbless shower
A tub nobody used became a curbless glass shower, with a long double vanity and heated floors.

- Budget
- $41,000
- Design
- 5 weeks
- Build
- 6 weeks
- Area
- 96 sq ft
All figures are samples for this demo.
The brief
The owners planned to stay in the house for twenty years, and wanted a bathroom that would still work when stairs and steps get harder.
The problem
A built-in tub took a third of the room, the shower had a high curb, and the subfloor under the tub had soft spots from an old leak.
Drawing and built
From the drawing to the room.
Slide to compare. Drawings on this demo are illustrated from the finished photos; on a client site, these are the real design drawings.


What changed
- Tub out, subfloor repaired, and a curbless shower with a linear drain
- Frameless glass, so the window lights the whole room
- A 72-inch double vanity with drawers instead of doors
- Heated floors and a quiet fan on a humidity sensor
- Blocking in the walls for grab bars later, without looking like it
How it went
Built in six weeks to the fixed price. The only change order was the owners adding a niche (sample).
“It looks like a hotel and it will still work when we are eighty. The drawings made it easy to say yes.”
Planning something similar?
See a budget range for yours
A kitchen for a family of five
A closed galley opened to the dining room, with an 11-foot island and seating for six.
- Budget
- $92,000
- Build
- 11 weeks

An open main floor in a split-level
Three small rooms opened into one, with built-ins, a fireplace wall, and a new stair rail.
- Budget
- $118,000
- Build
- 13 weeks
Next step
Start with a conversation.
An hour at your home to listen, look, and talk honestly about budget and timing. No charge, and no pressure to go further.